There is something addictive about a home renovation “reveal.”
Be it a television screen or in your own backyard, seeing a dated, cramped space transformed into a modern masterpiece is incredibly satisfying.
However, the glossy after-photos hide a stressful reality: the success of that final reveal is decided months, or even years.
Unfortunately, many homeowners let their excitement get the better of them. This “leap before you look” approach is exactly why so many projects fall to massive budget blowouts, unexpected council rejections, and months of unnecessary delays.
Below are the methodical approach to your planning phase, and to help your project stay on track, and budget.
Every structural change should be an answer to a specific question about how you intend to use the space. Without a defined “why,” it is easy to get distracted by trends that don’t solve your home’s issues.
| For Selling Plans | Every choice should support resale value and familiar layouts. Major structural changes can raise questions so keeping things conventional works best. |
| For Permanent Home | Prioritise practical storage, and spaces that support your routines, family needs, and future plans. Create a layout that reduces daily annoyances, and continues to work family size changes. |
Align your vision with your bank account. Budgeting is rarely a “set it and forget it” process. In a fluctuating economy, assuming that a project will cost the same as it did for a friend three years ago is a recipe for a mid-construction standstill.
Reach out to suppliers or consult with professionals to get a pulse on the current market. It is important to distinguish between “wants” and “needs” early on.
The most dangerous phrase in a renovation is “while we’re at it.” Once you peel back the plaster or dig up a foundation, you may discover:
You should always set aside a contingency fund equal to at least 20% of your total project cost. This is a financial safety net to hidden structural surprises or sudden price hikes.
Many homeowners assume the first call should be to a builder, and that’s a common mistake.
Bringing one in before you have a design can lead to inaccurate quotes. That’s when budgets start drifting and expectations get blurred. A proper design gives everyone a clear plan, helping the project stay realistic.
According to RFT home extension designers, this stage helps turn broad concepts into detailed, buildable plans that meet council requirements before a construction contract is signed.
You must understand the planning scheme that applies to your property. Local councils use zoning and overlays to control how land can be used and how neighbourhoods develop, which directly affects what you’re allowed to build.
| Planning Permit | Building Permit |
| Issued by the local council, this permit is about land use and the impact on the neighbourhood. It confirms if the proposed work is permitted within the zoning, assesses impacts such as overlooking or overshadowing neighbouring properties, and design is appropriate for the streetscape. | Issued by a building surveyor, this permit relates to safety and structural compliance.
It confirms the plans meet the requirements of the Building Code of Australia, including fire protection, energy efficiency, and the structural soundness of the building. |
Never settle for the first quote you receive.
Talking to multiple builders allows you to compare not just prices, but communication styles and professional standards. When comparing quotes, the lowest number isn’t always the best deal. You need to look closely at how the builder handles uncertainty. Two terms you must understand are:
These are fixed allowances for specific items that haven’t been chosen yet (e.g., “Taps: $1,500”). If the taps you eventually choose cost $2,000, you will have to pay the $500 difference plus the builder’s margin.
These are estimates for work where the final cost is unknown, such as excavation or “rock removal.”
A quote with too many PS items is a red flag, it means the builder hasn’t done enough due diligence, leaving you vulnerable to significant budget blowouts. Aim for a fixed-price contract wherever possible to minimize these variables.
A builder should provide proof of current registration with the relevant state authority, along with appropriate insurance coverage, including domestic building and public liability insurance.
It’s also important to understand how the builder handled changes, communication, and timelines during the project. Responsive communication at the quoting stage is a good indicator of how issues will be managed.
Many homeowners underestimate the “mess factor”, the psychological and physical toll of living in a construction zone. Staying in the house can save you money on rent, but it comes with trade-offs:
The most enduring homes are built on a foundation of patience and meticulous planning. By following these methodical approaches, your project goes from a state of “hoping for the best” to “planning for success.” You eliminate the guesswork, protect your hard-earned savings, and set clear expectations for everyone involved. If you’re ready to take the first step, consider booking a professional consultation. Getting your plans right from day one is the smartest investment you can make for the future of your home.
7 Steps to Plan Before Starting a Renovation
January 23, 2026Aircon Installation: How Long It Takes and Installation Process
January 23, 20267 Things to Inspect Before Buying a Kit Home
January 18, 2026Comparing House and Land Packages to Kit Homes
January 13, 2026Can I Put Up A Pergola Without Planning Permission In Adelaide?
January 8, 2026